Croydon Station, NSW

Peel Away 8

Recent works at Croydon Train Station saw the removal of multiple layers of paint from concrete walls and brickwork. The job was arduous due to the long term build up of paint which included the removal of paint between the mortar and bricks on those areas. The project required two applications of Peel Away 8 finishing the surface with pressure washing. The results are amazing with the natural brickwork being revealed and the concrete wall back to its original state.

To find out more about this project including Contractor details, please call our offices on 02 9746 6733

IMG_0487-edit
WE ARE OPEN - Delivery or Click and collect available. Tech advice 02 9746 6733
This is default text for notification bar